Dismantle and transfer FARASKUR Phase-1 compression station from FRASKUR site to el-BASSANT-2 site to divert Low pressure Balsam wells to the compression stations located at EL-Bassant-2 (with distance of 15 Km approximately) adjacent to the existing compression station, and will called BALSAM compression station at el Basant site