Early Production Facility (EPF) for Three Years Period:
– Conductor support structure “CSS” for 3 production wells (GNN3, GNN6 & GNN8) with a well bay supported by a MOPU
– MOPU is intended to be installed adjacent to EPF conductor support structure “CSS” and used for operating topside surface facilities and utilities.
– The GNN production to be transferred to the existing WP-C platform via two coil tube(s).